1.Project location
Located at the southern end of Futian District, Shenzhen, is an integrated passenger and freight transportation port in the central part of Shenzhen. In the south side of the port, Shenzhen and Hong Kong are connected through the Huanggang-Lok Ma Chau Bridge over Shenzhen River. In the west side of the port, there are Huanggang Road and Guangzhou-Shenzhen Expressway. In the north side of the port, it is close to the freeway Binhe Avenue.
2.Project Background
As one of the most important land border ports in China, Huanggang Port is located in Futian District, Shenzhen City, Guangdong Province, facing Hong Kong across the river.
The New Construction Project of Huanggang Port includes two parts: the new port construction project and the port comprehensive office building:
1) Located in the current Passenger Clearance Area of Huanggang Port, the new port covers an area of about 119,400 square meters and a gross floor area of about 400,000 square meters for design. The construction tentatively includes but is not limited to the port passenger clearance building, the inspection channel, the bus pick-up & drop-off area, the vehicle intensive inspection yard, and the connecting layer of public transportation, etc. The new port is surrounded by the current Metro Line 7, the planned Line 20, the Shenzhen-Guangzhou Central Axis Intercity Railway, the Guangzhou-Dongguan-Shenzhen Intercity Railway, and the proposed branch of Hong Kong MTR Northern Link.
2) The port comprehensive office building is located on the north side of the new port, covering an area of about 6,500 square meters and a floor area included into FAR calculation of about 136,000 square meters.
This project includes two parts: the new port and the port comprehensive office building.
1) New port: It includes all construction contents within the red line, the new port and Huanggang Road outside the red line, and the ramp of lane-changing interchange. The design contents include the scheme design, the scheme deepening and the preliminary specialized architectural design.
2) Port comprehensive office building: It includes all construction contents within the red line. The design contents include the scheme design, the scheme deepening and the preliminary specialized building design.
1.This public tender is open to all. Domestic and overseas design companies or organizations with legal business registration may apply for participation. Bidders are required to possess the design qualification of Grade A or above in China construction industry (construction engineering).
2.Joint groups are permitted. Individual applications or teams of individuals will not be accepted.
3.Joint groups shall meet the following requirements:
(1)One joint group shall include no more than 3 firms;
(2)Each member of the joint group shall not further apply alone or participate by joining another group with other design organizations.
(3)The joint group member shall sign the Joint Group Agreement legally and specify the leading member, as well as work distribution in each design stage and their share of rights and interests.
1.Pre-Qualification
Procedure of public bidding + pre-qualification is adopted for this project, to determine 9 shortlisted bidders and 2 alternative bidders with ranking.
2.Scheme Design Competition
The Tenderee set up a scheme review committee according to relevant laws. The scheme review committee adopts vote by open ballot to determine the top three candidates for winner without ranking.
3.Winner Deciding
A bid selection committee shall be established by the tenderee to determine the winner from the 3 candidates recommended by the scheme review committee.
Stage |
Time |
Matter |
Stage One Application and Pre-qualification |
Aug. 30 , 2019 |
Releasing pre-qualification tender announcement, and accepting pre-qualification applications |
Sep. 9, 2019, by 17:00 |
Query Deadline |
|
Sep. 12, 2019, by 17:00 |
Clarification, Amendment and Answering Period Deadline |
|
Sep. 20, 2019, by 17:00 |
Due date of pre-qualification application documents submission |
|
Oct. 8- Oct. 11, 2019 |
Pre-qualification review meeting and result announcing |
|
Oct. 12 - Oct.15 , 2019 |
Bidders to submit the Bidding Participation Confirmation original file with official seal and scanned copy |
|
Stage Two Design Competition |
Oct. 12, 2019 |
Bidding Tender Document and Detailed Design Brief release |
Oct. 15,2019 (tentative) |
Site survey and Q&A session |
|
Dec. 11, 2019, by 15:00 |
Bidders to submit deliverables |
|
Dec. 12,2019 (tentative) |
Scheme review meeting that requires bid presentation (Presentation place will be in Shenzhen, detailed presentation time and place will be noted through email before Dec. 1 , 2019 ) |
|
Stage Three Winner Deciding |
Dec. 30,2019 (tentative) |
Bid winner deciding |
Announcing the bid awarding results |
The design fee is RMB 50.08 million tentatively, including the basic design fee, BIM design fee, and compensation fee for excellent schemes not winning the bid.
1.The project sets up total compensation for excellent schemes not winning the bid of RMB5.6million (including tax paid by the winning bidder and the unsuccessful bidders).
2.The 2 bidders who get into the Winner Deciding stage but not winning shall be compensated at RMB 1 million each; The 6 bidders who get into the Design. Competition stage but not into Winner Deciding Stage shall be compensated at RMB 600,000 each.
Download the Pre-Qualification Document from:https://www.szjsjy.com.cn:8001/jyw/jyw/zbGongGao_View.do?ggguid=2c9e8ac26cb8f594016cdc8d3f192fba
The Tender Announcement Section of Shenzhen Construction Project Transaction Service Centre.
Engineering Design Management Center of Bureau Public Works of Shenzhen Municipality
Host: Engineering Design Management Center of Bureau Public Works of Shenzhen Municipality
Service assistance agency: Shenzhen Ehow Culture Communication Co., Ltd.
Contact information:
杨工 +86-185 6565 4352
E-mail: competition@ehow.net.cn