1. COMPETITION >
  2. DETAILS

公告进程时间:2021-03-30

This document serves as supplements to the Prequalification Documents of International Competition of Overall Conceptual Planning and Landscape Design for Blueways around Xili Reservoir issued on March 17, 2021. If there is any inconsistency between the original Prequalification Documents and this document, the latter shall prevail. Bidders should submit bid documents accordingly.

1. For the designers’ accurate understanding of the design scope, some figures in the Design Brief are updated, namely 6: Urban Design Scope on P12, Fig. 7: Research Scope on P13, Fig. 8: Existing Traffic Map on P16, Fig. 11: Water Source Protection Scope on P20, and Fig. 12: Basic Ecological Control Scope on P21. For details, please refer to Design Brief – Updated on March 17.

2. To facilitate the preparation of the draft conceptual proposal, the following data and information are supplemented. 1). Riverways; 2). Project Nodes; 3). Geological Conditions of the Site; 4).Regional Geological Structure; 6). Greenway Planning; 7). Relevant Information of Small and Medium Volume Rail Transit; 8). Water Source Protection Scope; 9). Basic Ecological Control Scope; 10). Traffic Plan; 11). Storage Pool Structural Drawings; 12). Site Images and Aerial photos. For details, please refer to Compressed File Folder of Basic Information.


Supplements:20210317180105设计任务书Design_Brief-317更新版Updated_Version.pdf

                    20210318093600基础资料压缩包Compressed_File_Folder_of_Basic_Information.rar

2021.3.18

This document serves as a clarification to the Prequalification Documents of International Competition of Overall Conceptual Planning and Landscape Design for Blueways around Xili Reservoir issued on March 17, 2020. If there is any inconsistency between the original Prequalification Documents and this document, the latter shall prevail and bidders shall submit bid documents accordingly.

Clarification Document:20210324234451西丽水库周边碧道整体概念规划及景观设计方案国际竞赛资格预审文件答疑文件Clarification_Document.pdf

2021.3.24

This document serves as supplements to the Prequalification Documents of International Competition of Overall Conceptual Planning and Landscape Design for Blueways around Xili Reservoir issued on March 17, 2021. If there is any inconsistency between the original Prequalification Documents and this document, the latter shall prevail. Bidders should submit bid documents accordingly.

1.Attached please find the “Makan River Basin Comprehensive Improvement Project - Planar Layout of Park Section” for the preparation of the draft conceptual proposals.

2.Please note the e-mail address set out in Chapter I: Project Profile of the Prequalification Documents is now changed to scd-competition@szdesigncenter.org.

Supplements:20210330150049西丽水库周边碧道整体概念规划资格预审文件补遗文件02.pdf

                    20210330150111麻磡河流域综合整治工程-公园段河道平面布置图.pdf

2021.3.30

Water Authority of Nanshan District, Shenzhen

Shenzhen Center for Design(Shenzhen Center for Public Art), Benecus Consultancy Limited

Contacts: Ms. Ye and Ms. Lai

Tel: (755) 832 484 64, 829 078 66

E-mail: scd-competition@szdesigncenter.org