公告进程时间:2021-03-18
The northern area of the eastern section of Jinling Road in Dapeng New District was originally the site selection plot for the cultural and sports center. After several rounds of site selection planning research, the layout of important administrative, cultural, public security, traffic police and other ancillary facilities in the new district is considered as a whole at this stage, and technical rooms such as the public security command center, archives, local chronicles museum, traffic police brigade and corresponding service supporting facilities are constructed.
Shenzhen is the capital of design. Its municipal party committee and municipal government, the party working committee and the administrative committee of the new district have reached an consensus on the high quality of the city. Through this competition, forward-looking and innovative building communities will be selected, so that the three groups of buildings can form an overall style that echoes with, supports and shares with each other on the premise of meeting their respective functional requirements and sign identification, create a new image of the new district, and promote the implementation of the next stage of the project.
The project is located on the northwest side of the intersection of Jinling Road and planned Jinye North Road in Kuichong Central District, Dapeng New District, Shenzhen City. Plots 09-06 and 09-07 of the statutory plans of Area 401-01 [Kuichong Central District] in Longgang (currently the statutory plans are being adjusted and are to be adjusted for public management and service facilities) are about 3.4 kilometers away from Dapeng Bay. Industrial land in the east, Bijia Mountain in the north, Hetang Landscape Park and Dapeng New District Management Committee in the west, Jinling Road connecting Jinye Avenue in the south, with excellent geographical location.
The land area of the project is about 77,174 square meters, with a total construction area of 178,329 square meters, including 112,337 square meters above ground and 65,992 square meters below ground (tentatively, the underground area is mainly for equipment rooms, parking and civil air defense, and the designer can adjust the terrain according to the specific plan).
The design needs to integrate the functions and spatial relations of technical houses such as public security command center, archives, local chronicles museum, traffic police brigade and corresponding service supporting facilities. Give full consideration to the cooperation of various professional designs and the sharing of public space resources. Overall consideration should be given to urban design, architectural design and landscape design.
(1)Archives and Local Chronicles Museum:
The total construction area is 96,364 square meters. (The above-ground construction area is about 64,862 square meters, and the underground construction area is about 31,502 square meters)
(2)Public Security Command Center:
The total construction area is 55,519 square meters. (The above-ground construction area is about 32,702 square meters, and the underground construction area is about 22,817 square meters)
(3)Traffic Police Brigade:
The total construction area is 26,446 square meters. (The above-ground construction area is about 14,773 square meters, and the underground construction area is about 11,673 square meters)
(4)Other peripheral functions:
According to the overall conditions of the site, relevant leisure and sports facilities shall be comprehensively arranged.
※ The final design content is subject to the content of the competition document.
(1) Joint team be legally registered companies or organizations.
(2) There are no qualification and performance requirements during the competition process.
(3) As the competition project is a collection of several individual projects, it is also required that two or more design agencies should be enrolled as a joint team to participate in the competition. The joint team should have the division of labor and combination of "overall design coordination + different individual architects", so as to achieve the overall sense of mutual connection of the construction group, and meet the design requirements of different parts (including progress) . Each member of the consortium shall not join another consortium with other design agencies to apply.
(4) The joint team members shall sign the Joint Team Agreement legally and specify the leading member, as well as work distribution, share of rights and interests during the project implementation phase if awarded with design contract.
(5) Individual or teams of individuals will not be accepted.
(1) Competition method: open application and invitation
(2) Competition Process:
Brief Scheme Submission Stage:
The brief Scheme shall give an analysis of existing urban design guidelines and the design brief, and make suggestions for improvement and a draft conceptual design for review.
※ If the 3 invited joint teams fail to provide brief Schemes as required by the design brief, they may be disqualified and replaced by alternative joint teams.
Conceptual Design Stage
The shortlisted joint teams shall make architectural conceptual design proposals for review under the established design brief and urban design guidelines. The competition will remain open to the public at this stage, and registration by independent joint teams is still workable. The independent joint teams should be reviewed before competing at this stage. (independent joint teams will not be rewarded with the bonus set up for the first stage).
Determination and Optimization Stage
The host shall set up a review committee to review the results and select the winner. The winner shall further develop and optimize the design based on the feedback from all sides.
Stage |
Time |
Item |
Brief Scheme submission stage |
2021.03.18(Tentative) |
Release Competition Announcement and accept registration |
2021.03.25(Before 17:00) (Tentative) |
Query Deadline |
|
2021.03.29(Before 17:00) (Tentative) |
Clarification, Amendment and Answering Period Deadline |
|
2021.04.13(Before 17:00) (Tentative) |
Deadline of competition document submission |
|
2021.04.14-04.19(Tentative) |
Competition review (closed bid) and result publicity |
|
概念方案阶段 Conceptual design stage |
2021.04.23(Tentative) |
release Official Competition Document and Design Brief |
2021.04.27(Tentative) |
Site Survey and Q & A Meeting (form to be notified) |
|
2021.04.30(Tentative) |
Query Deadline (via Email) |
|
2021.05.04(Tentative) |
Clarification Period Deadline (via Email) |
|
2021.06.05(Before 15:00)(Tentative) |
Design Competition deliverables submission Deadline |
|
2021.06.06-06.10(Tentative) |
Scheme review (closed bid) and result publicity |
|
Determination and optimization stage
|
2021.06.(Tentative) |
Notice of scheme development review result |
2021.06(Tentative) |
Scheme optimization |
Note:
(1)All time is subject to Beijing time. The Host reserves the right to adjust the agenda.
(2)Kind reminder: Since the schedule is quite tight for the Pre-qualification of this project, the joint team is suggested to organize the design team beforehand so as to prepare the work at the design competition stage as soon as possible.
(1)Bonus for the Brief Scheme Submission Stage:
8 shortlisted joint teams, with bonus of 500,000 RMB each.
(2) Bonus for the Conceptual design and optimization stage:
Note: Bonus for this stage do not include bonus for the brief Scheme submission stage.
Shenzhen Dapeng New District Management Committee
FuturePlus Academy
Enquiry Tel:Mrs Cai: +86 13590410014 Mr. Fu: +86 13923439321
Consultation time: Monday to Friday, Beijing time, 9:00-12:00,14:00-18:00
Enquiry E-mail:caixiaoling@futureplus.net.cn / fumingwei@futureplus.net.cn