1. COMPETITION >
  2. DETAILS

公告进程时间:2023-03-24

Bao'an District is located in the westernmost part of Shenzhen, bordering the Pearl River estuary in the west and Dongguan in the north. Shajing Sub-district is one of the ten sub-districts under the jurisdiction of Bao'an District, located in the northwest of Bao'an District, bordering Guangming District. The Project is sited in the middle and west of Shajing Sub-district, and the west side is the Waterlands Resort. The site is half-surrounded by the Waterlands Resort. The northeast is the Seventh Senior High School of Shenzhen. At the same time, there is the HaiShangTianYuanDong station of Shenzhen Metro Line 12 to the north. The tunnel section of Metro Line 12 passes through the red line on the east side of the Project.

According to the upper planning, the four roads around the Project site are all planned municipal roads (to be built), including Jinle Road in the west, Sanjianzai Road in the south, Minyuan Road and Jinwei Road in the north and east. The proposed land for the Project has not been leveled, and currently there are no buildings to be demolished inside the site, and there are a few seedlings.

The Shajing Sub-district Minzhu Community Nine-year Consistent School has a scale of 3,780 degrees in 81 classes (including 2,430 degrees in 54 classes of primary school and 1,350 degrees in 27 classes of junior high school), and 12 classes of mobile classrooms (including 270 degrees in 6 classes of primary school and 300 degrees in 6 classes of junior high school). The estimated total investment of the Project is 650.592 million yuan. The total land area of the Project is 44,008.97 m2, and the building area is 81,324 m2.

The project contents mainly include ① Compulsory school buildings (including teaching and teaching auxiliary rooms, office rooms, and living service rooms); ②Optional school buildings (storm corridor, overhead floor, underground parking garage and equipment room, etc.); ③ Teacher dormitory; ④Construction of outdoor supporting facilities, etc.

Figure  Project Location

Figure  Project Land and Surrounding Road Network Planning

Figure  Diagram of Current Situation and Surrounding Conditions of the Project (View from the Northeast)

Aerial Video of Site

Work Content

The bidding scope of the Project includes but is not limited to: scheme design, preliminary design and budget preparation, green building design consultation, prefabricated building design, sponge city design, construction waste recycling material utilization, water and soil conservation scheme design, cost estimation of feasibility study report preparation, building information model (BIM) design, construction drawing design, as-built drawing preparation, information collection, assistance in approval and construction application and relevant design services in the onsite construction cooperation and other stages. The Bidder shall also bear the responsibility for repeated modification without the review and approval by the Owner and the competent government departments, and other relevant cooperation matters assigned by the Owner.

Note: The final work content is subject to the Bidding Document and Design Contract, and the Tenderee has the right to adjust the work content according to the approval of the Project.

Registration Requirements

1.A bid applicant must be an independent legal entity, partnership business or other organization.

2.The bid applicant must have Grade A or above qualification for design in the construction industry (construction engineering discipline) issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China.

3.Qualification of project leader: the candidate must have the practicing qualification of first-class registered architect. In case of consortium bidding, the project leader must be the personnel of the leading unit.

4.Consortium bidding is allowed in the Project. The following requirements shall be met for consortium bidding:

① In case of consortium bidding, the leading unit shall have Grade A or above qualification for design in the construction industry (construction engineering discipline).

② The number of members of the consortium shall not exceed 2 (including the leading unit).

③ Members of the consortium shall not form other consortiums with other design agencies separately or in other names to participate in the registration.

④ The partners of the consortium shall sign a legally binding Consortium Agreement, and specify the leading unit, the division of responsibilities and the apportionment ratio and distribution method of design costs between both parties in each design stage.

5.Individual or individual combination are not allowed for registration in the Project.

Work Rules

The Project is conducted in the form of open bidding (pre-qualification) in three stages: the first stage - pre-qualification stage; the second stage - scheme bidding stage; the third stage - bid awarding stage. The conceptual proposal in the first stage of pre-qualification and the bidding scheme design in the second stage of scheme bidding are both in the form of closed bidding.

Download the Pre-Qualification Document、Design brief and other relevant information from the Tender Announcement Section of Shenzhen Public Service Platform for Public Resources Trading (Bao'an District).

Stages

Time

Item

Stage I

Pre-Qualification

2023.03.24-04.07

Release pre-qualification announcement and accept application

2023.03.29(Before 17:00)

Query deadline

2023.03.31(Before 17:00/17:00前)

Release of Q&A and addendum

2023.04.07(Before 17:00)

Deadline for submission of pre-qualification application materials

2023.04.20—04.25

Pre-qualification review and result publicity

2023.04.21—04.28

The Bidder submits the original closed bid Confirmation Letter (Electronic signature and seal are accepted)

Stage II

Scheme bidding

2023.04.27(Tentative)

Issue formal bidding documents and design assignment

2023.04.28(暂定/Tentative)

Survey Q&A meeting (organization form to be notified)

2023.05.16(Tentative)

Query deadline

2023.05.19(Tentative)

Release of Q&A and addendum

2023.06.12(Before 17:00)(Tentative)

The Bidder submits the Bidding Document

2023.06.13(Tentative)

Scheme review meeting (Closed bidding)

Stage III

Bid awarding stage

To be determined

Bid awarding

Publicity of bid winning results

Note: All times are subject to Beijing time, and the Tenderee reserves the right to adjust the schedule.

Prizes

 The fixed total design fee of the Project is 15,663,547 yuan (provisional).

Compensation

The compensation for bid failure is set for the Project, and the compensation standards are as follows: The successful bidder will be awarded the contract without compensation; the bidders who have ranked No. 2 and No. 3 and entered the process of bid awarding but failed to win the bid will be given 250,000 yuan each; the bidders who have ranked No. 4-No. 7 and have been identified as the formal bidders but have not entered the process of award of contract will be given 150,000 yuan each; and other bidders will not be compensated. The total compensation fee for bid failure is 1.1 million yuan (including the taxes paid), which shall be paid by the Tenderee to the unsuccessful bidder.

Winner

Award of contract

The bidders ranked No.2 and No.3

RMB250,000each

The bidders ranked No.4,5,6 and 7

RMB150,000each

Host: Bureau of Public Works of Bao'an District, Shenzhen

Tender organizater: Shenzhen Ehow R&D Center

                Shenzhen Zhonglianjian Engineering Project Management Co., Ltd.

Contact: Mr./Ms. Zheng

Tel: +86-18126316869

(9:00-12:00, 14:00-18:00 Beijing time Monday to Friday)

Mailbox: competition@ehow.net.cn