The official announcement of Tender for Shenzhen Fuwai Hospital Phase III of Chinese Academy of Medical Sciences Schematic Design and Architecture Design Development is released, design teams from around the global are welcome to follow our latest update.

01 Project Positioning

Shenzhen Fuwai Hospital of Chinese Academy of Medical Sciences (hereinafter referred to as "Shenzhen Fuwai Hospital" or "Hospital") is a high-level specialized cardiovascular hospital co-established by National Center for Cardiovascular Diseases, Fuwai Hospital of Chinese Academy of Medical Sciences(CAMS) and Shenzhen Municipal Government under the approval of the National Health Commission. It is also one of the municipal government's "Three Key Health and Medical Projects". As the only specialized cardiovascular hospital in Shenzhen, it undertakes the responsibility of meeting the major demands of Shenzhen citizens for cardiovascular medical services. The Hospital will integrate medical treatment, scientific research, teaching, health care, rehabilitation and prevention. Based in Shenzhen, it serves the Guangdong-Hong Kong-Macao Greater Bay Area and radiates Southeast Asia, and aims to become a modern, international, smart, iconic and advanced cardiovascular disease diagnose & treatment center and clinical medicine research center.

1:城市区位图 @深圳市深水水务咨询有限公司

2:项目区位图  @深圳市深水水务咨询有限公司

3:周边道路 @深圳市深水水务咨询有限公司

02 Bidding Scope

The bidding will determine the winning scheme of the project. The winning bidder will be responsible for the overall planning, functional organization, all-major schematic design, preliminary architectural design and other related design cooperation for Shenzhen Fuwai Hospital Phase III.

03 Project Overview

The total investment of the project is CNY 1.85165 billion. The project is situated at the north area of Nanshan Science and Technology Park, which sits on Langshan Road, Nanshan District, Shenzhen, China. With a gross floor area of 185,165 square meters, it is planned with 850 beds. And the construction mainly consists of seven basic facilities, spaces for physical examination, night duty dormitories, open floors, corridors, underground parking garage, public transportation interchange facilities, etc.

4:用地范围图@深圳市深水水务咨询有限公司

Work Content

1.Design Content

The work scope includes the overall planning and functional organization, all-major schematic design, preliminary architectural design and other related design cooperation for Shenzhen Fuwai Hospital Phase III.

2.Design Principles

The architectures of this project must fully embody the "people-oriented" design principle. Within the limited plot area, resource sharing and rational use of space should be realized, so as to create a beautiful, comfortable, convenient, extremely humanized, modern, landscaped and ecological garden-style hospital, and to build a new type of green and smart hospital with distinctive characteristics and originality.

3. Key Points


(1)Logical Design that Responds to Site Conditions 

Fully consider the height difference of the site, organize the relationship between entrances & exits and each building in a reasonable way, and realize separation of human flow and vehicle flow, as well as the reasonable integration of human flow, logistics and information flow.

2Diversified Services and Comfortable Medical Care

The design needs to meet the high-level medical demands of people in the pioneer demonstration area, pay attention to the patients' medical comfort, consider independent patient circulations, meet patients' medical privacy considerations, and provide high-quality diversified services.

3Style Continuation, New Architecture

The design shall pay attention to the holistic coordination, inclusiveness and continuation of the built landscape within the entire hospital. It shall not only reflect inheritance, but also show openness and characteristics of the era.

4Green Building, Low Carbon and Energy Saving

The design should strive to build a model of a new type of hospital with fresh air, sufficient natural light and spacious space.

5Reservation in Compliance with Regulations, Suitable for Both Peaceful and War Time

The design should pay attention to the control of in-hospital circulations and improve the overall anti-epidemic capability of the hospital. The overall planning shall pay special attention to avoiding pollution of hospital sewage, medical waste, radioactive materials and other medical waste to the hospital area and surrounding areas, and the transportation and disposal of medical waste should be planned reasonably.

6Management and Humanistic Care

The design should create a good medical environment and shape a unique humanistic spirit and feelings.

7Integrated Space and Healing Environment

The design should make full use of the current topography and landforms to blend the indoor and outdoor spaces together, create transitional spaces, enrich architectural forms, and improve the interior space environment, so as to let patients and visitors feel more comfortable.

8Uncomplicated and Standard Pipeline Layout

The design should take into consideration various factors such as urban planning, surrounding buildings, roads inside and outside the site, pipelines, and water drainage, etc.

Registration Requirements

1.The applicant must be a legally registered enterprise or organization.

2.Application as a joint group is allowed in this tender. Individuals or teams of individuals are unaccepted. Requirements for joint groups are as below:

(1)The number of joint group members should be no more than 2.

(2)Members of a joint group should not re-apply for the bid independently in the name of their own or other joint group constituted with other design institutes.

(3)A Joint Group Agreement with legal effect is required to clarify the leading member, equity share, proposed working responsibilities, division of work and so on.

Work Rules

1.Prequalification Stage

1.1 The bidding applicant shall submit prequalification application documents that include the capacity of the company and its design team and the conceptual proposal;

1.2 The prequalification review committee will comprehensively review the documents submitted by the bidding applicant.

1.3 The tenderee shall establish a prequalification review committee according to law, to review the valid prequalification application documents submitted by the bidding applicant, and select 9 candidate units without a ranking and 2 ranked alternative candidates in the way of disclosed ballot;

1.4 The 9 candidate bidders should submit Bidding Confirmation Letter in time. If one of the 9 candidate bidders quits the bidding at the second stage, the alternative candidate shall be replaced in order;

1.5 If the bidder who submitted the Bidding Confirmation Letter withdraws due to non-force majeure, the tenderee shall have the right to refuse the bidder to participate in the bidding for the tenderee's other projects in the future.

2.Design Bidding Stage

2.1 Candidate bidders selected through prequalification review will enter the second stage - design bidding stage with no objections after publicity;

2.2 The 9 bidders should submit deliverables that meet the requirements of Design Brief. Each bidder should only submit one scheme for bid competition;

2.3 The tenderee shall set up a bid evaluation committee according to relevant laws. The bid evaluation committee adopts vote by open ballot to determine 3 candidates without a ranking to enter bid determination stage.

3.Bid determination Stage

1Way of bid determination : one vote

2A bid determination committee shall be established by the tenderee to determine the winning bidder from 3 candidates recommended by the bid evaluation committee.

4.Tender Schedule

阶段

时间

事项

1.Open Application and Prequalification  Stage

2020.10.10-2020.11.3Tentative

Accept application

2020.10.10 Tentative

Issuance of prequalification announcement

2020.10.17(17:00前)Tentative

Deadline for query in writing (through email)

2020.10.23(17:00前)Tentative

Release addendum and query reply in writing

2020.11.3(17:00前) Tentative

Deadline for submission of prequalification application documents

2020.11.10Tentative

Prequalification evaluation

2020.11.23-2020.11.25暂定/ Tentative

资格预审评审结果公示Announcement of the results for prequalification evaluation

2020.11.23
Tentative

Submission of the original copy of Bidding Confirmation Letter with official seal (e-signature is acceptable)

2. Design Bidding Stage

2020.11.27Tentative

Issuance of Official Tender Document and Design Brief

2020.12.9Tentative

Site survey and Q&A meeting (organization form to be notified accordingly)

2020.12.15(17:00前)Tentative

Deadline for query in writing (through email)

2020.12.28(17:00前) Tentative

Query reply in writing (through email)

2021.1.8(15:00前)Tentative

Submission of deliverables

2021.1.15
Tentative

Bid evaluation meeting (sealed bid)

3. Bid Determination Stage

2021.1.25
Tentative

Determination of the winning bidder

2021.1.26-2022.1.28Tentative

Announcement of the bidding result

Note: All the time mentioned above is subject to Beijing time. The tenderee reserves the right to adjust the schedule.

Prizes

1.This bidding contract is a fixed unit price contract. The winning bid price is subject to the bid price. The total design fee is tentatively set at CNY19.54 million, which includes the basic design fee, BIM design fee and compensation fee for excellent schemes fail to win the bid. 

(1)The basic design fee is CNY17.64 million, with the unit price no more than CNY 95.3 per square meter.

(2)Compensation fee for failed bidders is CNY 1.9 million. 

The 6 units that entered the bid evaluation stage but did not enter the bid determination stage are each paid CNY 150,000.

The 2 units that entered the bid determination stage but did not win the bid shall are each paid CNY 500,000.

The standard of compensation fee for failed bidders is fixed, and the compensation fee will be adjusted during settlement according to actual situations. For bidding proposals that entered the bid evaluation stage, if the bid evaluation committee holds that a bidder's submissions violate Negative Articles specified in tender document or fail to reach the required detailing level or meet the bidding requirements, the tenderee will not pay any compensation to such bidder.


Tender Announcement

1.The tender has been officially announced, and the specific bidding content and tendering schedule are subject to the official tender announcement.

2.Link to the Tender Announcement: 

https://www.szjsjy.com.cn:8001/jyw/jyw/zbGongGao_View.do?ggguid=2c9e8ac274cf7c0801750b686d86259c

3.Intended participants shall start preparation for the bidding by registering at the Shenzhen Electronic Tendering Bidding Transaction Platform: 

https://www.szjsjy.com.cn:8001/jy-toubiao/;

Each member/unit of the joint group shall register separately.

4.Please click here to download the manual for conducting online enterprise information registration: https://w.url.cn/s/AsKJ9IZ.


All project information herein is subject to the tendering announcement published on Shenzhen Construction Engineering Transaction Service Website.

本公告或公示信息所有内容文字、图片和音视频资料,禁止任何媒体、网站、其他单位或个人进行商业性的转载、摘编、链接、转贴或以其他方式复制发布/发表;非商业性的转载、摘编、链接、转贴或以其他方式复制发布/发表,应注明信息来源:深圳市建筑工务署,转载或引用本公告或公示内容必须是以新闻性或资料性公共免费信息为使用目的的合理、善意引用,不得对本公告或公示内容原意进行曲解、修改。违者深圳市建筑工务署将依法追究其责任。

Tenderee: Engineering Design Management Center of Bureau of Public Works of Shenzhen Municipality

User: Shenzhen Fuwai Hospital of Chinese Academy of Medical Sciences

Co-organizer: Shenzhen Shenshui Water Resources Consulting Co., Ltd.

Enquiry Email:794430669@qq.com

Hotline: Mr.Deng +86-0755-25160759, 13602678591 (Monday - Friday (UCT+8) 9:00-12:00,14:00-18:00)


All project information herein is subject to the tendering announcement published on Shenzhen Construction Engineering Transaction Service Website.