1. COMPETITION >
  2. DETAILS

公告进程时间:2023-02-27

Education concerns the interests of the State and the Party. The report of the 20th National Congress of the Communist Party of China puts "implementing the strategy of rejuvenating the country through science and education and strengthening the support of talents for modernization" in a more important position, highlighting the basic, leading, and overall status and role of education in the new era. The Bao'an District Party Committee and Government always adhere to the "first strategy" of giving priority to the development of education, and spare no effort to provide education that satisfies the people, providing strong support for the realization of "good nursing for kids, good education for students" and assistance for urban development, further strengthening citizens' sense of gain and happiness for high-quality and balanced education, and further improving the influence and demonstration of Bao'an Education.

The new construction of 9-year school in Songgang Commercial Center urban renewal unit of Songgang Subdistrict is located in Songgang Subdistrict, Bao’an District, Shenzhen City, Guangdong Province, at the intersection of Songyuan Road and Songhe North Road. The Songgang Area where the project is located will become an important area of the western center of Shenzhen. According to relevant plans, the western center will become a comprehensive city center with Cantonese characteristics suitable for business and living, with perfect public service system, intertwined blue and green public spaces, and prominent historical and cultural heritage in the future. With the goal of "making education become the core competitiveness of Bao'an District", Bao'an District Government implements the education development plan as the direction, and taking "safety, stability, development, and improvement" as the guidance to fully promote the construction of educational facilities in Songgang Area.

The project hopes to select the best among the excellent school design schemes through open and fair design bidding, which can not only implement the educational development concept of Bao'an District, but also integrate and coexist with the surrounding urban environment and face the future. After the project is completed and put into use in the future, it will help to further improve the basic education facilities in Bao'an District, alleviate the pressure on school admission quotas in the district, and lay a foundation for talent cultivation and social development.

The project is located in Songgang Subdistrict, Bao'an District, Shenzhen City, Guangdong Province. Songgang Subdistrict is one of the 10 Subdistricts under the jurisdiction of Bao'an District, and it is the core area of Guangdong-Hong Kong-Macao Greater Bay Area. It is adjacent to the Pearl River Estuary in the west, Dongguan City in the north, and Guangming District in the northeast.

Project Site and Scope

The 9-year school in Songgang Commercial Center urban renewal unit of Songgang Subdistrict is located in the core area of Songgang Subdistrict, at the intersection of Songyuan Road (current) and Songhe North Road, and is part of the Songgang Commercial Center urban renewal unit. The northern and eastern sides of the site are urban villages and commercial buildings to be demolished, which are undemolished buildings in the urban renewal area. The western side is adjacent to the residential area (Jinghu Jiayuan), and the southern side is adjacent to the Songgang River.

Figure 11 Aerial Photography of the Current Situation of the Site (Southwest Perspective)


The New construction of 9-year school in Songgang Commercial Center urban renewal unit of Songgang Subdistrict has a proposed total land area of 24,439.88 square meters and a total construction area of 63,000 square meters,with a school scale of 54classes and 2520 students. The main construction scope includes: ①Mandatory School Buildings (including Teaching and auxiliary rooms buildings, office rooms, living service rooms); ② Optional School Buildings (including micro classroom, corridor with roof, open floor, underground garage and equipment spaces etc.) ③Teaching staff dormitory; ④ Synchronized Construction Works for Out-door Ancillary Facilities. ⑤ Outdoor emergency congregate shelter and indoor emergency congregate shelter, etc.

Scan the QR code below, or access the link to view the panoramic aerial view of the current situation of the site:

720yun.com

Work Content

The scope of tender for this Project include but not limited to : scheme design, initial design and budget estimation preparation, green building design consultation, prefabricated building design, sponge city design, utilization of construction wastes and recycled materials, water and soil conservation scheme design, assisting in estimation for preparing feasibility study, design for building information modeling (BIM), construction drawing design, as-built drawing preparation, information collection, construction application and approval assistance, and relevant design services such as on-site construction cooperation. Must take the responsibilities for repeated modification works raised due to failed in acquiring the approval from the owner or government authorities, and other relevant works instructed by the employer.

The project is funded by 100% government investment.

Registration Requirements

  1. The bidder applicant must be an independent legal person or partnership or other organization

  2. Applicants must be class-A qualification/certificate in Chinese architecture design and construction industry (Construction Engineering).

  3. Project leader is required to be Grade One registered architect in China. For consortium, project leader must be staff from the leading member.

  4. This project accepts consortium bidding, and the bidding partners in the consortium must meet the following requirements:

① If bidding by a consortium, the leading member must be class-A qualification/certificate or above in architecture design and construction industry (Construction Engineering).

② One consortium shall include no more than 2 members (including the leading member).

③ Members of the consortium may not register individually or as part of another consortium.

④ The consortium partners must sign a Consortium Agreement and clarify the head unit, division of labor between the two parties in each design stage, and design cost allocation ratio, distribution method, and other aspects.

  1. Individual or teams of individuals will not be accepted.

Work Rules

The project adopts open tendering (prequalified tendering), including Stage 1 Prequalification, Stage 2 Design Competition and Stage 3 Final Evaluation. The conceptual proposal in the first stage of prequalification and the bidding scheme designing the second stage of scheme bidding shall be in the form of sealed bid.

Stage

Date

Item

Registration and Pre-qualification

27th Feb—13th Mar 2023

Issue pre-qualification announcement and

accept registration

7th Mar 2023(before 17:00

Query deadline

10th Mar 2023(before 17:00

Clarification, amendment and answering period deadline

13th Mar 2023(before 17:00

Deadline of pre-qualification application document submission

2023.03.21—03.24

21st -24th Mar 2023

Pre-qualification review & result notice

2023.03.22—04.04

22nd Mar -4th Apr 2023

Shortlisted bidders submit original version

of stamped Tender Participation Confirmation

(e-signature & stamping accepted)

Design Competition Phase

22nd Mar 2023(Tentative

Release official tender document and design Brief

3rd Apr 2023(Tentative)

Survey and Q&A session (meeting form to

be notified separately)

25th Apr 2023(Tentative

Query deadline

28th Apr 2023(Tentative)

Clarification, amendment and answering period

deadline

5th May 2023 (before 17:00)(Tentative

Design deliverables submission deadline

8th May 2023(Tentative

Scheme review (sealed bid)

Final Evaluation Phase

undetermined

Final evaluation

Winning result announcement

Note: All the time mentioned above is Beijing time UCT+8. The Tenderee reserves the right to adjust the schedule.

Prizes

1.The fixed lump sum shall be CNY 11.874 million (tentative price for design cost).

2.The project offers compensation. The compensation standard is set as follows: No compensation for bid winner who will be issued with contract; CNY 220,000 for the bidders ranked No. 2 and 3 who entered the final evaluation stage but not the bid winner; CNY 100,000 for the bidders ranked No. 4, 5, 6 and 7 who confirmed as the formal bidders but failed to the final evaluation stage; and no compensation for the rests. The total compensation of CNY 840,000 (tax inclusive) shall be paid to unsuccessful bidders by the tenderee.

Winner

Award of contract

The bidders ranked No.2 and 3

RMB 220,000 each

The bidders ranked No.4, 5, 6 and 7

RMB 100,000 each



Tender Announcement&file download

Download the Pre-Qualification Document from the Tender Announcement Section of Shenzhen Exchange Group Co., Ltd. Bao'an Sub-center Website.

The final information shall be subject to the tender announcement / tender document issued by Bao'an Branch of Shenzhen Exchange Group Co., LTD.

To view the announcement and download the pre-qualification documents:

https://ba.szggzy.com/jygg/details.html?contentId=1796416

The tenderee has the final right of interpretation of the rules of this open tendering. The interpretation language is subject to Chinese.

Tenderee: Bureau of Public Works of Bao’an District, Shenzhen

Tender organizer: RJRX Urban Planning & Design Consultants Co. Ltd., Shenzhen

Agency: Shenzhen Zhonglianjian Engineering Project Management Co.,LTD

Contact:

Ms. Li:+86-13632658134 (Business and Procedure Issues Contact)

Mr. Chen:+86-13590282124 (Project and Technical Issues Contact)

Beijing time, Monday to Friday 9:00-12:00, 14:00-18:00